» Home Page

  » Photos

  » Videos

  » Weekly Deliverables

  » Links

  » Other Files

  » Final Report

  » Contact Info

  » Contact Webmaster

Email Us


  » ME4182 HOMEPAGE

  » Project Link

>

Weekly Deliverables

Week 2


Project Bids Aug 25,2004
Project Bids Aug 25,2004 (Powerpoint)

Week 3


Problem Statement Presentation Sept 1,2004
Problem Statement Presentation Sept 1,2004 (Powerpoint)
Design Partition Sept 1, 2004
Design Partition Sept 1, 2004 (MS Word)
Problem Statement Sept 1, 2004
Problem Statement Sept 1, 2004(MS word)
Project Plan and Task Assignments Sept 1, 2004
Project Plan and Task Assignments Sept 1, 2004(MS word)

Week 4


Conceptual Designs Presentation Sept 8, 2004
Conceptual Designs Presentation Sept 8, 2004 (Powerpoint)

Week 5


Conceptual Designs Sept 15, 2004
Conceptual Designs Sept 15, 2004 (Powerpoint)
Patents Sept 15, 2004
Patents Sept 15, 2004 (Powerpoint)

Week 6


Selection Analysis Sept 22, 2004
Selection Analysis (Powerpoint)

Week 7


Midterm Presentation Sept 29, 2004
Midterm Presentation Sept 29, 2004(Powerpoint)

Week 8


Post-Midterm Presentation Oct 6, 2004
Post-Midterm Presentation Oct 6, 2004(Powerpoint)

Week 9


Design Layout Presentation Oct 13, 2004
Design Layout Presentation Oct 13, 2004(Powerpoint)

Week 10


Engineering Analysis Presentation Oct 20, 2004
Engineering Analysis Presentation Oct 20, 2004(Powerpoint)

Week 11


Part Drawings Presentation Oct 27, 2004
Part Drawings Presentation Oct 27, 2004(Powerpoint)

Week 12


Force Analysis Presentation Nov 3, 2004
Force Analysis Presentation Nov 3, 2004(Powerpoint)

Final report


Final Presentation Dec 1, 2004
Final Presentation Dec 1, 2004(Powerpoint)

Videos
Acceleration Handle
Acceleration Pedal
Brake Handle
Gas Motion 1
Gas Motion 2
Brake Motion 1
Brake Motion 2
Brake Pedal

Final Report
Final Report (.doc), December 1, 2004
Final Report (.pdf), December 1, 2004

This site is © Copyright GT 2004-2005, All Rights Reserved
Steve's free web templates